img
PRODUCTS CENTER
+
  • 高真空超洁净气氛炉.jpg
  • 高真空超洁净气氛炉-1.jpg

High vacuum ultra clean atmosphere furnace

Service Support:

  • Product Description
  • Project

    Configuration and Metrics

    1

    Equipment structure
    The overall horizontal front and rear door opening structure of the equipment, mirror polishing of the 304 material, double-layer water cooling of the furnace body, and water cooling in the middle of the furnace shell. The side of the furnace body is provided with a water-cooled electrode, and the furnace body is provided with a vacuum pumping interface, an electrode interface, a charging interface, etc. The insulation screen is fixed on the stainless steel frame and arranged around the outside of the heating chamber. The vacuum coating chamber is φ1200 × 1000mm.

    2

    electronic control system
    It is composed of touch screen, programmable controller, voltage regulator, vacuum gauge and recorder to realize power supply, control, recording, monitoring, alarm and protection functions.

    3

    Heating and working system
    High purity tungsten/molybdenum heater, heating area 300 (deep) * 200 (wide) * 200 (high) mm, maximum heating power 60KW, maximum temperature 1800 ℃, working temperature ≤ 1600 ℃, temperature control accuracy 1 ℃, temperature measurement accuracy 1% FS, temperature uniformity 6 ℃. Multi-layer tungsten, molybdenum reflection screen and high temperature stainless steel screen are combined into closed space insulation. Tungsten rhenium thermocouple, monitoring thermocouple combination temperature control.

    4

    Vacuum system
    The vacuum system consists of a molecular pump, a mechanical pump, a vacuum gauge, a high vacuum flapper valve, a vacuum vent valve, a vacuum bellows, etc. The pumping speed of the dry pump is 160 m3/h, the pumping speed of the molecular pump is 18000 m3/h, the limit vacuum degree is 6.67 × 10-4Pa, and the working vacuum degree is 6.67 × 10-3Pa.

    5

    water cooling system
    It is composed of various valves, temperature measuring devices, water flow meters and pipeline related devices, with over-temperature of cooling water at key positions, water cut-off alarm and corresponding protection actions.

Key words:

Get Quote

Note: Please leave your E-mail and our professionals will contact you as soon as possible!

Security verification
Submit immediately